ES WhatsApp

AFO declaration in Roquetas de Mar

Roquetas de Mar has neither an AFO bylaw nor a specific AFO fee. What a real file resolved in 2024 shows is that the town hall charges the building tax (ICIO) on the work carried out, after a valuation by the council surveyor.

Content and fees reviewed by Álvaro García, registered architect no. 19625 (COAM), in November 2026.

From€1,500AFO declaration
Town hall
www.aytoroquetas.org
Time to resolve
6 months
If they do not resolve
Deemed refused
Our fee
from €1,500 + VAT

The council fee in Roquetas de Mar

No specific AFO fee

In the AFO file resolved by the Local Government Board on 4 March 2024, the decision orders a payment notice for the ICIO building tax on the work carried out without a licence, not an AFO fee. That same decision already applies articles 84.3.c) and 153.1 of the LISTA act and article 404 of the regulation, which confirms that Roquetas works to the current Andalusian rules.

We check the rate in force when the application is filed and confirm the total in writing before you commit to anything.

What AFO looks like in Roquetas de Mar

Roquetas has two very different realities and they are worth keeping apart. Inland, around Las Marinas and El Solanillo, it follows the Poniente pattern: houses on rural land among the greenhouses, with more than 1,900 hectares under plastic in the municipality.

Towards the sea, the whole coastal front is conditioned by the maritime-terrestrial public domain and its protection easement, and by protected areas that are far from minor: the Punta Entinas-Sabinar Nature Reserve, the Ribera de la Algaida wetland and the Posidonia reef. A file there needs a report from the Coastal Authority.

One point almost nobody takes into account: since June 2025 Roquetas has a compensatory levy bylaw for extraordinary development on rural land, with a general rate of 10 % of the construction cost and 15 % for detached houses. It is not the AFO fee, but it can appear along the way and it is better to know beforehand.

When you can apply for an AFO

  • The building must be finished. An AFO is not available for work still in progress.
  • The council's power to enforce planning law must have lapsed: as a general rule, more than six years since the work was completed.
  • It must meet minimum safety and health conditions: structural safety, weather-tightness, water and electricity, and waste water disposal and treatment.
  • If it is a dwelling, it must have at least a living or sleeping room, a kitchen and a separate bathroom, and habitable rooms must not be in a basement.
  • It must not stand on land with a real risk of erosion, flooding or landslip, unless measures have been taken.
  • There must be no planning enforcement procedure or court case open on the building.

What an AFO lets you do, and what it does not

What it does

  • It puts the property's legal status in writing, in a formal council resolution.
  • It allows maintenance, refurbishment and adaptation works, so the building can be kept in good order and used.
  • It gives access to mains water, drainage and electricity.
  • It is recorded at the Land Registry as a marginal note, which is what a notary or a bank will usually ask for.
  • On rural land it also has the effect of the subdivision licence required by Law 19/1995.

What it does not

  • It does not make the building lawful. It remains irregular; it simply can no longer be acted against.
  • It does not allow you to increase the footprint or the volume. No extensions.
  • It does not turn the land into development land or change its classification.
  • It does not exempt you from the taxes and charges due on what was built.
  • It is no use if the building stands on specially protected land or land with real hazards.

Questions about AFO in Roquetas de Mar

If there is no AFO fee in Roquetas, does it work out cheaper?

Not necessarily. What is charged is the ICIO building tax on the work carried out, and the ICIO rate is not trivial. We work it out case by case and give you a fixed figure in writing.

What if the council surveyor's report is unfavourable?

The town hall may open planning enforcement proceedings. That is why it is unwise to file an AFO without first checking that the requirements are met: a badly prepared application can make your position worse.

Do you own an unlicensed property in Roquetas de Mar?

Tell us about it and we will say whether there is a route, with the full cost in writing within 24 hours. The first consultation is free.

WhatsApp Call