AFO declaration in Berja
Berja has its own AFO fee and it is the most expensive in the Poniente: 4 % with a €1,000 minimum for anything built without a licence. But there is a 1 % band for buildings predating 1975, and in Berja that is far more common than you might think.
Content and fees reviewed by Álvaro García, registered architect no. 19625 (COAM), in November 2026.
- Town hall
- www.berja.es
- Time to resolve
- 6 months
- If they do not resolve
- Deemed refused
- Our fee
- from €1,500 + VAT
The council fee in Berja
Published fee
- Rate
- 4.00 % for work built without a licence or not in accordance with it · 1.00 % for buildings predating the 1975 act and for those built in accordance with their licence
- Calculated on
- construction cost according to an official price database or the professional institutes' standard rates
- Minimum fee
- €1,000 in the 4 % band · €500 in the 1 % bands
- Bylaw
- Council Tax Bylaw no. 26
- Published in
- Almería Official Gazette (BOP) no. 299 of 27 November 2012, amended in BOP no. 82 of 3 May 2016
Watch one expensive detail: if the town hall opens the file on its own initiative, the fee carries a 100 % surcharge. In other words, waiting for them to come to you doubles the bill. And the bylaw states expressly that no exemption or reduction will be granted.
We check the rate in force when the application is filed and confirm the total in writing before you commit to anything.
What AFO looks like in Berja
Berja breaks the Poniente pattern. Here the dominant irregular building is not the house among greenhouses but the cortijo and the scattered dwelling in the Sierra de Gádor and in the Río Chico and Río Grande valleys, with an unusually dense network of hamlets: Alcaudique, Benejí, San Roque, Castala, Chirán, El Cid, La Peñarrodada, Hirmes, Benínar and more than twenty smaller place names.
That makes the 1 % band for buildings predating the 1975 act far more relevant here than in El Ejido or La Mojonera. Dating a cortijo properly, with aerial photographs and historical cadastral records, can be the difference between paying 4 % with a €1,000 minimum and 1 % with a €500 minimum.
In the town centre the usual case is different: two-storey houses with a courtyard and load-bearing walls where, over the years, undeclared work has been carried out, or where two dwellings share a single title deed.
When you can apply for an AFO
- The building must be finished. An AFO is not available for work still in progress.
- The council's power to enforce planning law must have lapsed: as a general rule, more than six years since the work was completed.
- It must meet minimum safety and health conditions: structural safety, weather-tightness, water and electricity, and waste water disposal and treatment.
- If it is a dwelling, it must have at least a living or sleeping room, a kitchen and a separate bathroom, and habitable rooms must not be in a basement.
- It must not stand on land with a real risk of erosion, flooding or landslip, unless measures have been taken.
- There must be no planning enforcement procedure or court case open on the building.
What an AFO lets you do, and what it does not
What it does
- It puts the property's legal status in writing, in a formal council resolution.
- It allows maintenance, refurbishment and adaptation works, so the building can be kept in good order and used.
- It gives access to mains water, drainage and electricity.
- It is recorded at the Land Registry as a marginal note, which is what a notary or a bank will usually ask for.
- On rural land it also has the effect of the subdivision licence required by Law 19/1995.
What it does not
- It does not make the building lawful. It remains irregular; it simply can no longer be acted against.
- It does not allow you to increase the footprint or the volume. No extensions.
- It does not turn the land into development land or change its classification.
- It does not exempt you from the taxes and charges due on what was built.
- It is no use if the building stands on specially protected land or land with real hazards.
Questions about AFO in Berja
Why is the fee so high in Berja?
Because the general band is 4 % and there is a €1,000 minimum on top. It is worth checking first whether the building falls into the 1 % band, which covers those predating 1975 and those built in accordance with their licence.
Enforcement proceedings have been opened against me. Should I wait?
Quite the opposite, and in Berja very clearly so: if the file is processed on the council's own initiative, the bylaw applies a 100 % surcharge. Getting ahead of it literally halves the cost.
My cortijo is very old but I have no paperwork. How is that proved?
With historical aerial photographs, mapping, cadastral certification and, if needed, a notarial record. It is part of our work and it is usually what adds most value to the file.
Do you own an unlicensed property in Berja?
Tell us about it and we will say whether there is a route, with the full cost in writing within 24 hours. The first consultation is free.