AFO declaration in La Mojonera

La Mojonera does have its own AFO bylaw, dating from 2012, and a fee with different rates depending on the land: 4 % on rural land, 3 % on urban land and 1.50 % for out-of-plan buildings and those predating 1975, with a minimum of €100.

Content and fees reviewed by Álvaro García, registered architect no. 19625 (COAM), in November 2026.

From€1,500AFO declaration
Town hall
www.lamojonera.es
Time to resolve
6 months
If they do not resolve
Deemed refused
Our fee
from €1,500 + VAT

The council fee in La Mojonera

Published fee

Rate
4.00 % on rural land · 3.00 % on urban land · 1.50 % for out-of-plan buildings and those predating the 1975 act
Calculated on
the real and effective cost of the building work
Minimum fee
€100
Bylaw
Council tax bylaw on the AFO recognition fee, and bylaw on the documents to be filed
Published in
Almería Official Gazette (BOP) no. 213 of 5 November 2012 (documents) and BOP of 11 December 2012 (fee)

If you withdraw once the file has been opened, 70 % of the fee is still charged. It is one of the few councils in the province that sets out in writing exactly which documents it requires.

We check the rate in force when the application is filed and confirm the total in writing before you commit to anything.

What AFO looks like in La Mojonera

La Mojonera is the smallest and most agricultural municipality of the group: 1,466 hectares of greenhouses, the sixth largest area under plastic in the province. The AFO profile is almost always the same — a house or a store on rural land surrounded by greenhouses.

Its bylaw has two articles worth reading before anything else. Article 11 says the owner may not occupy the building before recognition. Article 12 says utility companies will require proof of that recognition before connecting services. In other words: without an AFO you cannot contract electricity or water normally.

The bylaw expressly accepts historical aerial photographs and the property's registry history as proof of the completion date, which makes older files considerably easier. And it requires you to describe how water, drainage and electricity are solved independently: connection to mains networks is admitted only exceptionally.

When you can apply for an AFO

  • The building must be finished. An AFO is not available for work still in progress.
  • The council's power to enforce planning law must have lapsed: as a general rule, more than six years since the work was completed.
  • It must meet minimum safety and health conditions: structural safety, weather-tightness, water and electricity, and waste water disposal and treatment.
  • If it is a dwelling, it must have at least a living or sleeping room, a kitchen and a separate bathroom, and habitable rooms must not be in a basement.
  • It must not stand on land with a real risk of erosion, flooding or landslip, unless measures have been taken.
  • There must be no planning enforcement procedure or court case open on the building.

What an AFO lets you do, and what it does not

What it does

  • It puts the property's legal status in writing, in a formal council resolution.
  • It allows maintenance, refurbishment and adaptation works, so the building can be kept in good order and used.
  • It gives access to mains water, drainage and electricity.
  • It is recorded at the Land Registry as a marginal note, which is what a notary or a bank will usually ask for.
  • On rural land it also has the effect of the subdivision licence required by Law 19/1995.

What it does not

  • It does not make the building lawful. It remains irregular; it simply can no longer be acted against.
  • It does not allow you to increase the footprint or the volume. No extensions.
  • It does not turn the land into development land or change its classification.
  • It does not exempt you from the taxes and charges due on what was built.
  • It is no use if the building stands on specially protected land or land with real hazards.

Questions about AFO in La Mojonera

What will the fee cost me if my house is among the greenhouses?

That is rural land, so 4 % of the construction cost, with a €100 minimum. It is the highest rate in the Poniente alongside Berja, and it should be in the budget from the outset.

My cortijo predates 1975. Is it still 4 %?

No. Buildings predating the 1975 act are charged at 1.50 %, the same as out-of-plan buildings. That is why dating the building properly pays off: the difference is substantial.

Can I get the electricity connected while the file is being processed?

The bylaw makes that difficult: article 12 requires proof of recognition before the utility company. It is one of the reasons people end up doing the AFO.