AFO declaration in Níjar
Níjar is by some margin the municipality with the most AFO casework in the province: 599 km², 36 separate settlements, and a very large part of the territory inside the Cabo de Gata-Níjar Natural Park, where the AFO route is heavily restricted.
Content and fees reviewed by Álvaro García, registered architect no. 19625 (COAM), in November 2026.
- Town hall
- www.nijar.es
- Time to resolve
- 6 months
- If they do not resolve
- Deemed refused
- Our fee
- from €1,500 + VAT
The council fee in Níjar
Amount not published
There is a municipal application form for a certificate of assimilated-to-out-of-plan status which refers to a municipal bylaw and a tax bylaw, but the document we located predates the LISTA act and is hosted on another council's server, so we do not treat it as reliable. We publish no rates or charges without verifying them in the official gazette.
We check the rate in force when the application is filed and confirm the total in writing before you commit to anything.
What AFO looks like in Níjar
There are two Níjars and they need separating. In the Campo de Níjar, with Campohermoso and San Isidro as the main settlements, housing on rural land tied to intensive greenhouse farming dominates: the same pattern as the Poniente, on an enormous scale.
In the Natural Park strip (San José, Las Negras, Agua Amarga, Isleta del Moro, Rodalquilar, Pozo de los Frailes, Boca de los Frailes) the story is different. This is specially protected rural land, and there AFO recognition is the exception, not the rule. Worth knowing before commissioning a file that will not succeed.
Níjar also has colonisation villages and its own municipal housing plan, which introduces nuances absent elsewhere. And with 36 settlements, the exact location of the plot completely changes the diagnosis.
When you can apply for an AFO
- The building must be finished. An AFO is not available for work still in progress.
- The council's power to enforce planning law must have lapsed: as a general rule, more than six years since the work was completed.
- It must meet minimum safety and health conditions: structural safety, weather-tightness, water and electricity, and waste water disposal and treatment.
- If it is a dwelling, it must have at least a living or sleeping room, a kitchen and a separate bathroom, and habitable rooms must not be in a basement.
- It must not stand on land with a real risk of erosion, flooding or landslip, unless measures have been taken.
- There must be no planning enforcement procedure or court case open on the building.
What an AFO lets you do, and what it does not
What it does
- It puts the property's legal status in writing, in a formal council resolution.
- It allows maintenance, refurbishment and adaptation works, so the building can be kept in good order and used.
- It gives access to mains water, drainage and electricity.
- It is recorded at the Land Registry as a marginal note, which is what a notary or a bank will usually ask for.
- On rural land it also has the effect of the subdivision licence required by Law 19/1995.
What it does not
- It does not make the building lawful. It remains irregular; it simply can no longer be acted against.
- It does not allow you to increase the footprint or the volume. No extensions.
- It does not turn the land into development land or change its classification.
- It does not exempt you from the taxes and charges due on what was built.
- It is no use if the building stands on specially protected land or land with real hazards.
Questions about AFO in Níjar
My house is inside the Natural Park. Can I regularise it?
On specially protected land the AFO route is heavily restricted, and in many cases there is no way forward. We are not going to charge you to process something we know will fail: we check first and tell you straight.
I have a house among the greenhouses in Campohermoso. Is that different?
Very. Outside the protected areas the file is the standard one for the Almería countryside: date the building, evidence the minimum conditions, and solve water, drainage and electricity independently.
Do you own an unlicensed property in Níjar?
Tell us about it and we will say whether there is a route, with the full cost in writing within 24 hours. The first consultation is free.