AFO declaration in Almerimar
Almerimar belongs to El Ejido, so the AFO declaration is decided by El Ejido town hall, with a fee of 1.20 % of the real cost of the building work. We are on your doorstep: our practice is in Almerimar.
Content and fees reviewed by Álvaro García, registered architect no. 19625 (COAM), in November 2026.
- Town hall
- www.elejido.es
- Time to resolve
- 6 months
- If they do not resolve
- Deemed refused
- Our fee
- from €1,500 + VAT
The council fee in Almerimar
Published fee
- Rate
- 1.20 %
- Calculated on
- the real and effective cost of the building work
- Bylaw
- Council Tax Bylaw no. 41 of El Ejido town hall
- Published in
- Almería Official Gazette (BOP) of 5 November 2012
The fee is reduced by 60 % if you withdraw before the resolution is issued.
We check the rate in force when the application is filed and confirm the total in writing before you commit to anything.
What AFO looks like in Almerimar
In Almerimar the typical case is not the country house but the extra work done on a property that did have a licence: the porch that was enclosed, the basement that was fitted out, the top floor that grew, or the pool that was never signed off. Article 404 of the Andalusian regulation covers any class of land, so that work can be recognised too.
Proximity to the sea is the filter that rules out most cases. Between the maritime-terrestrial public domain, its protection easement and the coastal influence zone, there are positions where the file requires a report from the Coastal Authority and others where there is simply no route. We check that before we start.
Around the marina and the resorts there are a good many foreign owners who bought without knowing the property had unlicensed work. We can handle the whole file in English.
When you can apply for an AFO
- The building must be finished. An AFO is not available for work still in progress.
- The council's power to enforce planning law must have lapsed: as a general rule, more than six years since the work was completed.
- It must meet minimum safety and health conditions: structural safety, weather-tightness, water and electricity, and waste water disposal and treatment.
- If it is a dwelling, it must have at least a living or sleeping room, a kitchen and a separate bathroom, and habitable rooms must not be in a basement.
- It must not stand on land with a real risk of erosion, flooding or landslip, unless measures have been taken.
- There must be no planning enforcement procedure or court case open on the building.
What an AFO lets you do, and what it does not
What it does
- It puts the property's legal status in writing, in a formal council resolution.
- It allows maintenance, refurbishment and adaptation works, so the building can be kept in good order and used.
- It gives access to mains water, drainage and electricity.
- It is recorded at the Land Registry as a marginal note, which is what a notary or a bank will usually ask for.
- On rural land it also has the effect of the subdivision licence required by Law 19/1995.
What it does not
- It does not make the building lawful. It remains irregular; it simply can no longer be acted against.
- It does not allow you to increase the footprint or the volume. No extensions.
- It does not turn the land into development land or change its classification.
- It does not exempt you from the taxes and charges due on what was built.
- It is no use if the building stands on specially protected land or land with real hazards.
Questions about AFO in Almerimar
Does Almerimar town hall handle my AFO?
Almerimar is not a municipality: it is a district of El Ejido. The file is processed and decided by El Ejido town hall, under its bylaw and its fee.
I enclosed the porch years ago without a licence. Can that be sorted out?
If more than six years have passed since it was finished and it meets the minimum safety and health conditions, yes, through the AFO route. If six years have not passed, we are talking about obtaining a licence, which is a different path.
Do you own an unlicensed property in Almerimar?
Tell us about it and we will say whether there is a route, with the full cost in writing within 24 hours. The first consultation is free.