AFO declaration in Adra

Adra has had its own AFO bylaw since 2013, and it is the only one in the area that sets out in writing both the deadline and the effect of silence: six months to resolve and, if there is no resolution, the application is deemed refused.

Content and fees reviewed by Álvaro García, registered architect no. 19625 (COAM), in November 2026.

From€1,500AFO declaration
Town hall
www.adra.es
Time to resolve
6 months
If they do not resolve
Deemed refused
Our fee
from €1,500 + VAT

The council fee in Adra

Amount not published

Bylaw
Municipal bylaw on the administrative procedure for declaring out-of-plan and assimilated-to-out-of-plan status (bylaw no. 15)
Published in
Almería Official Gazette (BOP) no. 67 of 10 April 2013

The planning bylaw is verified and refers to a tax bylaw whose amount we have not been able to substantiate. Adra's planning licence fee has no AFO heading. We confirm it with the town hall before giving you a fixed quote.

We check the rate in force when the application is filed and confirm the total in writing before you commit to anything.

What AFO looks like in Adra

Adra is the municipality where flood risk decides most files. There are designated flood zones in the town itself and in Guainos Bajos, El Lance de la Virgen, La Curva, Puente del Río and La Alquería, as well as all the land bordering the river Adra. The regulation excludes from AFO any building on land with a real risk of flooding, so this is not a detail: it is the first filter.

Adra's own bylaw provides a specific regime for protected land, the coastal influence zone and land with natural or technological hazards, which makes it more precise than the provincial average.

Add to that thirteen kilometres of coast, with its maritime-terrestrial public domain, and the Albufera de Adra Nature Reserve in the river delta. Between the water and the environmental protection, in Adra it pays to study feasibility before commissioning anything.

When you can apply for an AFO

  • The building must be finished. An AFO is not available for work still in progress.
  • The council's power to enforce planning law must have lapsed: as a general rule, more than six years since the work was completed.
  • It must meet minimum safety and health conditions: structural safety, weather-tightness, water and electricity, and waste water disposal and treatment.
  • If it is a dwelling, it must have at least a living or sleeping room, a kitchen and a separate bathroom, and habitable rooms must not be in a basement.
  • It must not stand on land with a real risk of erosion, flooding or landslip, unless measures have been taken.
  • There must be no planning enforcement procedure or court case open on the building.

What an AFO lets you do, and what it does not

What it does

  • It puts the property's legal status in writing, in a formal council resolution.
  • It allows maintenance, refurbishment and adaptation works, so the building can be kept in good order and used.
  • It gives access to mains water, drainage and electricity.
  • It is recorded at the Land Registry as a marginal note, which is what a notary or a bank will usually ask for.
  • On rural land it also has the effect of the subdivision licence required by Law 19/1995.

What it does not

  • It does not make the building lawful. It remains irregular; it simply can no longer be acted against.
  • It does not allow you to increase the footprint or the volume. No extensions.
  • It does not turn the land into development land or change its classification.
  • It does not exempt you from the taxes and charges due on what was built.
  • It is no use if the building stands on specially protected land or land with real hazards.

Questions about AFO in Adra

My house is near the river Adra. Can I apply for an AFO?

That has to be looked at with the flood-zone maps in front of us. If the building stands on land with a real risk of flooding, the regulation does not allow recognition unless measures have been taken. We check it before you spend money.

How long does the town hall take to decide?

Its bylaw sets six months, and if it does not resolve in time the application is deemed refused. The clock stops while they wait for you to evidence any works they have required.

Do you own an unlicensed property in Adra?

Tell us about it and we will say whether there is a route, with the full cost in writing within 24 hours. The first consultation is free.