AFO declaration in El Ejido
In El Ejido the AFO declaration is decided by the town hall, and the council fee is 1.20 % of the real cost of what was built — one of the lowest in the province. On top of that come our fees, from €1,500.
Content and fees reviewed by Álvaro García, registered architect no. 19625 (COAM), in November 2026.
- Town hall
- www.elejido.es
- Time to resolve
- 6 months
- If they do not resolve
- Deemed refused
- Our fee
- from €1,500 + VAT
The council fee in El Ejido
Published fee
- Rate
- 1.20 %
- Calculated on
- the real and effective cost of the building work
- Bylaw
- Council Tax Bylaw no. 41
- Published in
- Almería Official Gazette (BOP) of 5 November 2012
If you withdraw before the resolution is issued, the fee is reduced by 60 %. El Ejido also has its own supporting-documents sheet (reference D230-AFOR), stricter in detail than the Andalusian regulation.
We check the rate in force when the application is filed and confirm the total in writing before you commit to anything.
What AFO looks like in El Ejido
El Ejido probably holds the largest volume of irregular building in the Poniente, and nearly all of it follows one pattern: a house or a store built on rural land among the greenhouses. Las Norias de Daza, Pampanico, San Silvestre and the scattered plots of the Campo de Dalías are where we see most cases.
On the coastal strip the profile changes completely: villas and plot subdivisions in Almerimar, Balerma, Guardias Viejas and Matagorda. There the coastal influence zone and the nearby Punta Entinas-Sabinar Nature Reserve come into play, and they can rule out an AFO on a building that would be recognised without difficulty inland.
El Ejido is also the only town in the Poniente with a Greenhouse Bylaw in force since 2017, which governs what can be done on agricultural plots and is worth reading before anything else.
When you can apply for an AFO
- The building must be finished. An AFO is not available for work still in progress.
- The council's power to enforce planning law must have lapsed: as a general rule, more than six years since the work was completed.
- It must meet minimum safety and health conditions: structural safety, weather-tightness, water and electricity, and waste water disposal and treatment.
- If it is a dwelling, it must have at least a living or sleeping room, a kitchen and a separate bathroom, and habitable rooms must not be in a basement.
- It must not stand on land with a real risk of erosion, flooding or landslip, unless measures have been taken.
- There must be no planning enforcement procedure or court case open on the building.
What an AFO lets you do, and what it does not
What it does
- It puts the property's legal status in writing, in a formal council resolution.
- It allows maintenance, refurbishment and adaptation works, so the building can be kept in good order and used.
- It gives access to mains water, drainage and electricity.
- It is recorded at the Land Registry as a marginal note, which is what a notary or a bank will usually ask for.
- On rural land it also has the effect of the subdivision licence required by Law 19/1995.
What it does not
- It does not make the building lawful. It remains irregular; it simply can no longer be acted against.
- It does not allow you to increase the footprint or the volume. No extensions.
- It does not turn the land into development land or change its classification.
- It does not exempt you from the taxes and charges due on what was built.
- It is no use if the building stands on specially protected land or land with real hazards.
Questions about AFO in El Ejido
What does an AFO in El Ejido cost in total?
Two items: the council fee, 1.20 % of the cost of what was built, and our fees, from €1,500. For a house of around 120 m² out in the campo the council fee usually comes to a few hundred euros. We give you the full figure in writing within 24 hours, with no surprises.
I have a house among the greenhouses in Las Norias. Does it qualify?
It depends on two things: that more than six years have passed since the work was finished, and that it does not stand on land with real hazards or special protection. The first is proved with aerial photographs and the cadastre; the second we check before you spend anything.
Does an AFO let me extend the house afterwards?
No. The recognition lets you maintain, refurbish and adapt it, but not increase the footprint or the volume. If what you want is to extend, we need to look at a different route.
Do you own an unlicensed property in El Ejido?
Tell us about it and we will say whether there is a route, with the full cost in writing within 24 hours. The first consultation is free.